Shanghai BRT Shanghai BRT Shanghai BRT

Shanghai Route 71 busway

updated: 26 February 2021    Full page map    Shanghai BRT photos

Shanghai
Peak throughput (passengers / hr / direction): 2,180  East of Changde Rd station, AM peak, west-east, 8-Nov-2018   
Year system commenced: 2017   
System name: Shanghai medium volume 71 road   
Number of BRT stations: 25   
Segregated busways or bus-only roadways:    
Pre-board fare collection and fare verification:    

Performance

Peak throughput (passengers / hr / direction): 2,180  East of Changde Rd station, AM peak, west-east, 8-Nov-2018   
Peak buses / hr / direction: 40  Changde Rd station, AM peak, west-east, 2018.11.8   
AM peak speed (full corridor, peak direction): 17.2km/hr  21 Jul, 27,30,31 Aug, 1,2,3 Sep 2021   
PM peak speed (full corridor, peak direction): 18.0km/hr  21 Jul, 27,30,31 Aug, 1,2 Sep 2021   
BRT system coverage (2-way roads) (1 fare): 27 km   
Operational mode: trunk-only   
Routes operating both inside & outside BRT roads: 3  1250, 1251,748   https://baike.baidu.com/item/%E4%B8%8A%E6%B5%B7%E5%BB%B6%E5%AE%89%E8%B7%AF%E4%B8%AD%E8%BF%90%E9%87%8F%E5%85%AC%E4%BA%A4/24511866
Routes operating only in busway corridors: 3  Route 71, Route 71 interval line, Route 71 interval extension   https://baike.baidu.com/item/%E4%B8%8A%E6%B5%B7%E5%BB%B6%E5%AE%89%E8%B7%AF%E4%B8%AD%E8%BF%90%E9%87%8F%E5%85%AC%E4%BA%A4/24511866
System passenger-trips per day: 50000  As of June 2019, the highest number of passengers carried in a single day exceeded 50,000 passenger trips   https://baike.baidu.com/item/%E4%B8%8A%E6%B5%B7%E5%BB%B6%E5%AE%89%E8%B7%AF%E4%B8%AD%E8%BF%90%E9%87%8F%E5%85%AC%E4%BA%A4/24511866
Average bus occupancy (peak direction & point): 55   
Network of routes and corridors     
High peak period operational speed (>20km/hr)     
Buses operating both in & out of BRT corridors     

Vehicles & ITS

Fleet of special BRT buses: 68   
Fleet of regular buses using BRT stations: 0   
Fleet of 18m or larger BRT buses: 40   
Fleet of integrated BRT feeder buses: 0   
Type of fare collection / verification technology: Card, cash,QR code  Need to download the Shanghai Transport Card App   http://gongyi.cnr.cn/list/20180104/t20180104_524086325.shtml
Location of bus doorways: Left side  traffic is on the right   
Number of doors in BRT buses: 2-3  2 for 12m, 3 for 18m   
BRT vehicle length: 12m, 18m   
No. of seats in 12m BRT buses: 25   
No. of seats in 18m BRT buses: 35   
BRT vehicle fuel: electric   
BRT bus manufacturer: Yutong   
Real-time next bus information displays     
Distinctive BRT buses     
Sliding doors in BRT stations     
Low-emission vehicle technology (≥Euro III)     
Automated fare collection and fare verification     
System control centre     
High-quality passenger information on buses     
Audio announcements on BRT buses     
Real-time CCTV surveillance at all stations     

Other

Year system commenced: 2017   
System name: Shanghai medium volume 71 road   
Lead local design / planning work: Shanghai Municipal Engineering Design and Research Institute (Group) Co.,Shanghai Denso Intelligent Systems Co.   
Distinctive marketing identity for system     

Electric buses

Main type of charging: electric trolleybus  2017.06, Shanghai Zhongyunliang 71   site visit
Max. charging service fee for 12m e-buses: 1.3 yuan / kwh  2016.5.5-2020.12.31   http://www.escn.com.cn/news/show-557463.html


Infrastructure

Number of BRT stations: 25   
Stations with functioning passing lanes: 0   
Most station substops: 1   
Location of busway lanes: Centre of roadway  Mostly underneath an elevated road   
Total length of dedicated busway: 17.5 km   
Length including mixed traffic portions: 17.9 km   
Average distance between stations: 745m   
Number of corridors: 1   
Number of BRT terminals: 2   
Number of BRT depots: 1   
Segregated busways or bus-only roadways     
Enhanced station (more than just a bus shelter)     
Overtaking lanes at more than 75% of stations     
Bike sharing in vicinity of BRT stations     
Wheelchair accessible stations     
Distinctive BRT stations     
>1 substop at >75% of stations (requires overtaking)     
Includes BRT-only tunnels or bridges     
>1 stop position at stopping area at >75% of stations     
Stations away from intersections     
Station size based on passenger demand     
Full weather protection on most station platforms     
Full weather protection on all station platforms     
Covered station access     
Escalators/lifts at >20% of stations with bridges/tunnels     
Level boarding and alighting     
High-quality passenger information at stations     
Bicycle parking at BRT stations     
Segregated bike lanes along main corridor(s)     
Improvements to nearby public space     
Physical BRT laneway dividers     

Regulation & costs

Fare type (flat fare or distance-based): flat fare   
Median cash fare: 2 元   
Median smart card fare: 2 yuan   
Infrastructure cost per km: 1 billion yuan+ for 17.5km  2017 value   
BRT bus operator(s): Shanghai Bashi Public Transport Co.   
12m BRT bus cost: 1.09m yuan   
18m BRT bus cost: 201万元   
Operating hours: 4:30am-11:30pm   
More than one BRT bus operator     
Pre-board fare collection and fare verification     
Payment per bus-kilometre rather than per passenger     
No operational subsidy from government     subsidy needed
Buses paid for by operators rather than government     
BRT authority plans and controls the system     

Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT Shanghai BRT

Creative Commons Attribution License. You may use for any purpose, but only with attribution / credit to Far East Mobility.