Cali BRT Cali BRT Cali BRT

Cali Mio

updated: 4 July 2013    Full page map    Cali BRT photos

Cali
Peak throughput (passengers / hr / direction): 11,100  24-Jun-2013, east of San Pascual, PM peak, W-E   
BRT Standard score: SILVER   
Year system commenced: 2009  Opened 1 March   
System name: Mio   
Number of BRT stations: 58  Incl. Julio Rincon   
Segregated busways or bus-only roadways:    
Pre-board fare collection and fare verification:    

Performance

Peak throughput (passengers / hr / direction): 11,100  24-Jun-2013, east of San Pascual, PM peak, W-E   
Peak buses / hr / direction: 164  24-Jun-2013, San Pascual station, AM peak, E-W   
AM peak speed (full corridor, peak direction): 19.5km/hr  T31,T47A,T50,T42,29 Sep 2021   
PM peak speed (full corridor, peak direction): 18.0km/hr  T31,T47A,T50,T42,29 Sep 2021   
Operational mode: hybrid  18m buses trunk only, 12m in & out of corridor   
Routes operating only in busway corridors: 10  T57A, T57B, T47A, T47B, T40, T31, E37, E31, E21, E27   
System passenger-trips per day: 170,000    [CCAP 2012]
Average bus occupancy (peak direction & point): 68   
Highest peak hour boardings at a single station: 2,250  24-Jun-2013, Petecuy station, PM peak   
Network of routes and corridors     
High peak period operational speed (>20km/hr)     
Buses operating both in & out of BRT corridors     
Most bus passengers in BRT corridors carried by BRT buses     
Net time saving for bus passengers in corridor     

Vehicles & ITS

Fleet of special BRT buses: 220  Phase 1 18m buses only; not incl. 12m buses   
Fleet of regular buses using BRT stations: 0   
Fleet of 18m or larger BRT buses: 220   
Location of bus doorways: 2 sides 12m buses, 1 side 18m buses  traffic is on the right   
Number of doors in BRT buses: 4  4 in 18m. 5 doors (2+3) in 12m, which can go out of corridor   
BRT vehicle length: 12m, 18m   
No. of seats in 18m BRT buses: 41 and 48  Volvos 48 seats (112 standing), Mercedes 41 seats (119 standing)   
BRT vehicle fuel: diesel   
BRT bus manufacturer: Volvo, Mercedes Benz   
Real-time next bus information displays     
Distinctive BRT buses     
Sliding doors in BRT stations     Many not functioning or malfunctioning
Low-emission vehicle technology (≥Euro III)     
Automated fare collection and fare verification     
System control centre     
High-quality passenger information on buses     Lack of reliable next-stop information on many routes
Audio announcements on BRT buses     Only on some trunk buses

Other

BRT Standard score: SILVER   
Year system commenced: 2009  Opened 1 March   
System name: Mio   
Project website: http://www.mio.com.co   
Distinctive marketing identity for system     Mio

Electric buses


Infrastructure

Number of BRT stations: 58  Incl. Julio Rincon   
Stations with functioning passing lanes: 90%   
Most station substops: 3   
Location of busway lanes: Centre of roadway   
Longest BRT station (non terminal): 155m  3 substops   
Shortest BRT station: 45m   
Total length of dedicated busway: 34 km   
Length including mixed traffic portions: 35.6 km   
Station platform width (including walls & doors): 5m   
Station platform height: 1m   
Average distance between stations: 630m   
Number of corridors: 6   
Segregated busways or bus-only roadways     
Enhanced station (more than just a bus shelter)     
Overtaking lanes at more than 75% of stations     
Bike sharing in vicinity of BRT stations     
Wheelchair accessible stations     
Distinctive BRT stations     
>1 substop at >75% of stations (requires overtaking)     Most stations have only 1 substop
Includes BRT-only tunnels or bridges     
>1 stop position at stopping area at >75% of stations     
Stations away from intersections     
Station size based on passenger demand     Not in all corridors
Full weather protection on most station platforms     
Full weather protection on all station platforms     
Covered station access     
Signal priority or grade separation at intersections     
Level boarding and alighting     
High-quality passenger information at stations     
Bicycle parking at BRT stations     
Segregated bike lanes along main corridor(s)     
Improvements to nearby public space     
Physical BRT laneway dividers     

Regulation & costs

Fare type (flat fare or distance-based): flat fare   
Median smart card fare: 1,500 pesos   
Infrastructure cost per km: US$14.44 million  2012 value. Source: IADB 2015   
BRT bus operator(s): Includes: Git Masivo, ETM, Unimetro, Blanco y Negro   
BRT management agency: Metro Cali S.A.   
More than one BRT bus operator     
Pre-board fare collection and fare verification     
Competitively bid operating contracts     
BRT authority plans and controls the system     Metro Cali SA

Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT Cali BRT

Creative Commons Attribution License. You may use for any purpose, but only with attribution / credit to Far East Mobility.